Basement Finishing
in Utah
Add usable square footage and resale value with a fully finished basement — engineered, permitted, and built to current Utah code.

What's included
- Egress windows and code-compliant bedrooms
- Home theaters, gyms, and wet bars
- ADU and rental conversions
- Radon mitigation and waterproofing
- 10-year workmanship warranty
- Typical timeline
- 8–14 weeks
- Warranty
- 10 years
Utah neighborhoods we build in
We've completed projects across Utah — most commonly in these neighborhoods.
- Lehi
- Saratoga Springs
- Eagle Mountain
- American Fork
- Pleasant Grove
- Highland
- Alpine
- Draper
- Provo
- Orem
- Utah HB 82 / SB 174 internal ADU permits and rental conversions
- Radon testing and mitigation standard on every project
- Egress windows and bedroom code compliance handled in-house
Our process
Same five steps on every basement finishing project — no surprises.
- 01
Discovery walkthrough
We walk the home with you, measure, photograph existing conditions, and ask the questions most contractors skip — how you actually use the space, what's broken about the current layout, and what 'finished' looks like for you.
- 02
Design & fixed-price quote
You receive a detailed scope of work, material allowances, and a single fixed price — not a vague estimate. Nothing gets ordered or demoed until you sign.
- 03
Permits & scheduling
We pull every required city and county permit, schedule inspections, and publish a week-by-week build calendar before crews show up on site.
- 04
Owner-led build
André is on site, not just the salesman. Every subcontractor is vetted, licensed, and supervised. Daily photo updates, weekly walkthroughs.
- 05
Final walkthrough & 10-year warranty
We don't disappear after the final invoice. Every project includes a 10-year workmanship warranty and a 30-day touch-up window after move-back-in.
Why a local Utah contractor matters
Utah homeowners hire us because we live here, build here, and stand behind every project.
- Owner-led builds — you talk to the person responsible, not a project manager three layers removed.
- Licensed, bonded, and insured Utah general contractor.
- Crews live in Utah County. No two-hour commute, no rotating subs.
- All permits, inspections, and HOA paperwork handled in-house.
- Fixed-price contracts with published schedules — no surprise change orders.
- 10-year workmanship warranty on every project.
Frequently asked questions
How long does basement finishing take?+
Most full basements take 8–14 weeks from permit issuance to completion. ADU conversions with separate entries and kitchens run 12–16 weeks.
Can you add a bedroom to my basement?+
Yes — we install code-compliant egress windows and route HVAC to make basement bedrooms legal and comfortable.
Do you handle radon mitigation?+
Yes — radon mitigation systems are standard on every Utah basement we finish, and we test before and after.
Can you convert my basement into a rental ADU?+
Yes. Utah law (HB 82 / SB 174) allows internal ADUs in owner-occupied single-family homes. We handle the permit, separate entry, kitchen, and code compliance.
Let's Talk
Get in touch to start your project and see how we can bring your vision to life.